Skip to main content

Manage tasks

Tasks & Reports on the start page lists all configured tasks. Enable the checkbox of a task and choose the action.

Edit a task​

  1. Enable the checkbox of the task in the list.
  2. Select Edit. The task assistant opens with the current settings.
  3. Change what is needed: schedule, backup options, storage location, notifications, pre- and post-task commands or the user account.
  4. Select OK to save the changes, or Cancel to discard them.

After changing critical parameters – the storage location of the backups or the source drives – check that the task still runs. For incremental tasks the relationship between the full backup and the backups of changes must remain intact, and after a change of the user account or the network paths, verify the authentication and the permissions.

Check a task​

Check task verifies that the selected task has valid settings – that it is syntactically and logically executable on the local system.

Delete a task​

Enable the checkbox of the task and select Delete task. The task is removed permanently; its backups stay on the disk.

Several tasks at once​

Enable the checkboxes of several tasks to apply one of these actions to all of them:

ActionPurpose
DeleteRemoves all selected tasks permanently.
ExportSaves the tasks to a file for other computers or for documentation.
ImportLoads previously exported tasks into the task list.

Export and import tasks​

  • Export task: enable the checkbox of the task and select Export task. Save the task file (.xml), for example to an external storage device, to reuse it on another computer.
  • Import task: select Import tasks, choose the task file, and the task is added to the list.

Imported tasks are not enabled automatically. Check them and enable them by hand – especially when drive letters, paths or network conditions differ from the source computer.

Defaults​

Program settings > Tasks and Reports sets whether a double-click starts a task or opens it for editing, and the storage locations of tasks and reports. See Program settings.